5 Minutes of Quick Tips: The Top 3 Alternative Delivery Methods
If you’re building the same structure several times and need a price upfront, lump sum DB is the way to go!

If traditional design-bid-build is a no-go for your project, here are the pros and cons of the 3 most common alternative delivery methods.
If you’re breaking the traditional design-bid-build mold for the first time and are obsessed with budget control, CMAR might be the right method for you!
If you're installing complex technology and are on a tight schedule, progressive DB is your best bet!